Das könnte Sie auch interessieren:

"Die Geissens" werden in den Adelsstand gehoben

München (ots) - "Die Geissens" zwischen Obertauern und Paris - Neue Doppelfolge über Deutschlands wohl ...

Presseportal.de punktet mit neuem responsiven Design

Hamburg (ots) - Presseportal.de, eines der reichweitenstärksten Portale Deutschlands, punktet ab sofort mit ...

Big Bang zum Abschluss: Wer gewinnt das Finale der ProSieben-Show "Masters of Dance"?

Unterföhring (ots) - Wer gewinnt die ProSieben-Show "Masters of Dance"? Im großen Finale am Donnerstag, 10. ...

13.07.2010 – 08:01

Andritz AG

EANS-Adhoc: ANDRITZ HYDRO to supply propeller turbines for Lower Mattagami hydropower project, Canada

--------------------------------------------------------------------------------
  ad-hoc disclosure transmitted by euro adhoc with the aim of a Europe-wide
  distribution. The issuer is solely responsible for the content of this
  announcement.
-------------------------------------------------------------------------------- 

13.07.2010

Vienna/Graz, July 13, 2010. International technology Group ANDRITZ has been awarded a contract by Kiewit-Alarie A Partnership to supply three propeller turbines and generators for the Lower Mattagami River Project being developed by Ontario Power Generation in Ontario, Canada. The new units will be added to the Little Long, Harmon, and Kipling stations and will supply green energy to the Canadian grid as from June 2014. The order value is approximately 100 MEUR.

ANDRITZ HYDRO´s scope of supply includes engineering, supply, and installation of three vertical propeller turbines (output 68 MW to 80 MW, diameter 6 m), three generators, as well as protection, control systems, governors, and excitation equipment.

The three hydropower stations each have a net head of approximately 30 m; although this would normally be the range for using Kaplan turbines, in this case propeller turbines deliver the most favorable solution for the customer in terms of efficiency and durability due to the increased water flow rate of almost 300 m3/s and the highly robust equipment. Since acquisition of the hydropower business of General Electric (GE) in 2008, ANDRITZ has excellent know-how on development and manufacturing of this particular type of turbine, which is used frequently in Canada.

- End -

The ANDRITZ GROUP The ANDRITZ GROUP is a global market leader for supply of systems and services to the hydropower, pulp and paper, metals, and other specialized industries (solid/liquid separation, feed and biofuel). The Group is headquartered in Graz, Austria, and has a staff of approximately 13,400 employees worldwide. ANDRITZ operates over 120 production sites, service and sales companies all around the world.

ANDRITZ HYDRO ANDRITZ HYDRO is a world leader in the supply of turnkey plants and services for hydropower stations. In addition, rehabilitation and upgrading of existing plants are offered. Further fields of activity are development, design, and manufacture of pumps for selected applications (e.g. for water transport, in the energy sector, and in the pulp and paper industry) and of turbo generators for gas and steam power plants.

end of announcement                               euro adhoc
-------------------------------------------------------------------------------- 

Further inquiry note:

Dr. Michael Buchbauer
Head of Group Treasury, Corporate Communications & Investor Relations
Tel.: +43 316 6902 2979
Fax: +43 316 6902 465
mailto:michael.buchbauer@andritz.com

Branche: Machine Manufacturing
ISIN: AT0000730007
WKN: 632305
Index: WBI, ATX Prime, ATX
Börsen: Wien / official market

Original-Content von: Andritz AG, übermittelt durch news aktuell

Alle Meldungen
Abonnieren Sie alle Meldungen von Andritz AG
  • Druckversion
  • PDF-Version

Themen in dieser Meldung