Das könnte Sie auch interessieren:

Big Bang zum Abschluss: Wer gewinnt das Finale der ProSieben-Show "Masters of Dance"?

Unterföhring (ots) - Wer gewinnt die ProSieben-Show "Masters of Dance"? Im großen Finale am Donnerstag, 10. ...

Kraftvolle Kooperation: Fitness-Magazin SHAPE launcht "Sophia Thiel Magazin" / Ab 9. Januar 2019 im Handel

München (ots) - Sie war die erste Influencerin auf der Titelseite von SHAPE. Jetzt wachsen die starken Marken ...

Hypebeasts 2018: Was ist noch heiß, was verbrannt? - Neue Ausgabe von treibstoff: Das Magazin von news aktuell

Hamburg (ots) - Die neue Ausgabe von treibstoff ist erschienen (4/18). Im Magazin der dpa-Tochter news ...

31.03.2000 – 10:10

Jenoptik AG

ots Ad hoc-Service: Jenoptik AG

The sender is solely responsible for the contents of this announcement. -----------------------------------------------------

    Jena (ots Ad hoc-Service) -      
    Jenoptik involved in building work for Infineon's 300mm
semiconductor fab in Dresden. Jenoptik subsidiary M+W Zander is
awarded a million order.

    M+W Zander, a subsidiary of the Technology Group JENOPTIK AG in Jena, (security code No. 622910) will be involved in building work for the new semiconductor plant of Infineon Technologies AG. Infineon is going to invest more than one billion Euros in a new production facility at its Dresden location. A special company under the name of Infineon Technologies SC 300 GmbH & Co. KG will be established for the semiconductor fab.

    According to a statement released by JENOPTIK AG on Friday in Jena, the order volume for M+W Zander is clearly in the three-digit million Euros range. Further details about the building project are to be announced during the foundation ceremony late in May this year.

    Competitive advantage through know-how in the 300-millimetre technology.

    The new Infineon factory ranks among the first production facilities to manufacture chips based on the 300-millimetre technology on a global scale. Since 1998 Infineon has cooperated with Motorola in a joint venture to develop a new manufacturing technology and has successfully tested one of the most advanced production plants which is also located in Dresden. In an Infineon-guided project study under the name of "Fab of the Future", M+W Zander contributed essential know-how required to design the production facilities for the new technology generation in chip manufacturing.

    Contact:

    Public Relations Katrin Lauterbach Phone: + 49-3641-65 2360

    Investor Relations Sabine Barnekow Phone: +49-3641- 65 2156

End ----------------------------------------------------- Internet: http://recherche.newsaktuell.de

Original-Content von: Jenoptik AG, übermittelt durch news aktuell

Alle Meldungen
Abonnieren Sie alle Meldungen von Jenoptik AG
  • Druckversion
  • PDF-Version